Establishment of test booklets

Test booklets are prepared on the basis of the TSI, e.g. for the project Lainzer Tunnel.

Execution of constituent checks

according to Module B and F of the TSI , e.g. for sleeper types L1 and L2 of Maba Fertigteilindustrie GmbH and for the 60E1 turnout generation of VAE.

Checks for sub-systems and aspects

according to Module SG , e.g. for

  • BahnhofCity Wien West (ÖBB)
  • New main railway station Vienna (ÖBB)
  • Section Linz–Summerau (ÖBB)

Expert activities

by specially qualified personnel of BCT in the scope of licensing procedures according to the railway law (e.g. type authorization for track systems, turnouts etc. according to the railway law as of 1957; building permits for track systems, bridges, tunnels, noise protection walls, building construction, contact line systems, safety devices, transformer substations, railway junctions etc. according to the railway law as of 2006; design certifications.)

  • BahnhofCity Wien West (ÖBB)
  • New main railway station Vienna (ÖBB)
  • Terminal Wien Inzersdorf (ÖBB)
  • Section Linz–Summerau (ÖBB)
  • Section Gänserndorf–Marchegg (ÖBB)
  • Branch Laubenbachmühle (NÖVOG)
  • Depot Inzersdorf (WLB)
  • U2-North underground railway (Wiener Linien)
  • Tramway line 26 (Wiener Linien)
  • Tramway line Harter Plateau (Linz Linien)

Consulting activities

e.g. for the Ministry for Traffic, Innovation and Technology for the execution of the directive 2004/49/EC on railway safety.